page 6–5
Lift Housing Removal and Replacement
Required Tools:
#2 Phillips Screwdriver
Bungee Cord (or Equivalent)
5/16” Socket Wrench
Side Cutters
9/16” Socket Wrench
Floor Jack
7/32” Hex Allen Socket Wrench
Sawhorses (or Equivalent)
2x4 (or Equivalent)
3/8” Socket Wrench (w/ 6” extension)
Procedure:
NOTE
If you need more space to work under the base frame, place a 2x4 across the base frame rails and use a
floor jack to raise the base frame off the floor.
1.
Unplug the bed power cord from the wall socket.
2.
Using a 5/16” socket wrench, remove the six bolts holding the lower lift cover to the base and remove
the cover.
3.
Using a #2 Phillips screwdriver, remove the three screws holding the upper lift cover to the base. If you
want, hold the covers out of the way by using bungee cords (or the equivalent) to secure them to the litter
top.
4.
Remove the lift motor and capacitor (refer to procedure on page 6–4).
5.
Remove lift potentiometer (refer to procedure on page 6–7).
6.
Using a 5/16” socket wrench, remove the cable clamps holding the power and sensor coil cords on top
of the lift housing assembly. Cut the cable ties and disconnect the coil cords from under the lift housing.
The power and sensor coil cords are now free of the lift housing assembly. Drape them up out of the way.
7.
Using a 7/32” hex Allen socket, remove the two screws holding the lift screws to the header crossbar
plate.
8.
Lift the litter top up and support it about 6” above the lift screws with sawhorses or the equivalent.
Summary of Contents for 2031
Page 18: ...page 1 13 Bed Symbols ...
Page 27: ...page 3 4 Notes ...
Page 39: ...page 4 12 Notes ...
Page 52: ...page 6 11 Power and Sensor Coil Cord Replacement Illustration A B A B VIEW FROM CENTER OF BED ...
Page 71: ...page 8 6 Notes ...
Page 78: ...Base Assembly and Options page 10 3 FOOT END HEAD END ...
Page 80: ...Base Assembly and Options page 10 5 HEAD END HEAD END ...
Page 81: ...Base Assembly and Options page 10 6 HEAD END LEFT SIDE FOOT END ...
Page 82: ...Base Assembly and Options page 10 7 Typical Both Ends Typical Both Ends ...
Page 101: ...Optional Epic Base Assembly page 10 26 HEAD END HEAD END ...
Page 102: ...Optional Epic Base Assembly page 10 27 HEAD END HEAD END FOOT END ...
Page 103: ...Optional Epic Base Assembly page 10 28 ...
Page 104: ...Optional Epic Base Assembly page 10 29 ...
Page 109: ...Litter Assembly and Options page 10 34 ...
Page 110: ...Litter Assembly and Options page 10 35 GC ...
Page 111: ...Litter Assembly and Options page 10 36 GB ...
Page 112: ...Litter Assembly and Options page 10 37 ...
Page 113: ...Litter Assembly and Options page 10 38 HEAD WALL VIEW ...
Page 114: ...Litter Assembly and Options page 10 39 CPR RELEASE ...
Page 115: ...Litter Assembly and Options page 10 40 CPR SLIDE BRACKET DETAIL ...
Page 116: ...Litter Assembly and Options page 10 41 GROUNDING DETAIL HEAD END FOOT END ...
Page 117: ...Litter Assembly and Options page 10 42 HEAD END FOOT END SIDERAIL EXTENSION CABLE ROUTING ...
Page 123: ...Notes page 10 46 2 ...
Page 127: ...Epic Litter Option Assembly page 10 50 ...
Page 128: ...Epic Litter Option Assembly page 10 51 ...
Page 129: ...Epic Litter Option Assembly page 10 52 ...
Page 132: ...Head End Siderail Assembly Left and Right page 10 55 ...
Page 133: ...Head End Siderail Assembly Left and Right page 10 56 CARRIER ARM ASSEMBLY ...
Page 135: ...Head End Siderail Assembly Left and Right page 10 58 LEFT HEAD END SIDERAIL WIRE ROUTING ...
Page 136: ...Head End Siderail Assembly Left and Right page 10 59 RIGHT HEAD END SIDERAIL WIRE ROUTING ...
Page 147: ...Foot End Siderail Assembly Left and Right page 10 70 ...
Page 177: ...2040 120 4 Optional Pleur Evac Rack with Defibrillator Tray page 10 100 ...
Page 183: ...2025 40 Optional Bed Extender Pad page 10 106 ...