Page 12
Due to continuous product research and development,
the information contained herein is subject to change without notice.
www.stoddart.com.au
www.stoddart.co.nz
1. Remove service compartment cover
2. Connect electrical wiring, following the below wiring diagram
After connecting wires, use a multimeter to check:
- There is no electrical dispersion between the phases and the earth
- For electrical continuity between the external casing and the mains earth
3. Reinstall service compartment cover
4. Secure wiring cable by fastening the cable gland nut
2.3.2 Wiring
2
3
4
5
1
2
3
4
5
1
415V 3N
50/60 Hz
230V 1N
50/60 Hz
L1
L1
N
N
N
L1
L1
L2
L3
N
PE
PE
1
2
3
4
5
6
1
2
3
4
5
6
GAS ONLY
ELECTRIC ONLY
Model
SEHE061WT
SEHE062WT
SEHE101WT
SEHE102WT
SEHE201WT
SEHE202WT
Weight
107
170
140
190
260
340
Power (kW)
11.4
415V 3Ø + N + E
(3 x16A)
23.1kW
415V 3Ø + N + E
(3 x33A)
18.2kW
415V 3Ø + N + E
(3 x26A)
28.3kW
415V 3Ø + N + E
(3 x40A)
36.7kW
415V 3Ø + N + E
(3 x52A)
54.1kW
415V 3Ø + N + E
(3 x76A)
Model
SEHG061WT
---
SEHG101WT
SEHG102WT
SEHG201WT
SEHG202WT
Weight
135
---
165
220
270
350
Power
(kW)
1.4kW
230V 1Ø + N + E
10A Plug and Lead
---
1.5kW
230V 1Ø + N + E
10A Plug and Lead
3.3kW
230V 1Ø + N + E
15A Plug and Lead
3.3kW
230V 1Ø + N + E
15A Plug and Lead
4.1kW
230V 1Ø + N + E
20A Plug and Lead
2.0 Installation