Plug connectors on the lift mast
–
Before fitting the attachment, depressurise
the hydraulic system; see the chapter enti-
tled "Depressurising the hydraulic system".
CAUTION
Risk of damage to components!
Open connections on the plug connectors (1) can
become dirty. Dirt can enter the hydraulic system.
The plug connectors can become stiff.
–
Once the attachment has been disassembled,
seal the plug connectors using the protective
caps.
Mounting attachments
Only competent persons are permitted to
mount and connect the energy supply to the
attachment.
–
Observe the information provided by the
manufacturer and supplier or sub-supplier
of the attachment when doing so.
NOTE
Please observe the definition of the following
responsible person: "competent person".
–
Switch off the truck.
–
Install the attachment.
–
Switch on the truck.
–
Check and ensure that all functions of the
installed attachment are working properly.
Load capacity with attachment
The permissible load capacity of the attach-
ment and the permissible load (load capacity
and load moment) of the truck must not be ex-
ceeded by the combination of the attachment
and the payload. Comply with the specifica-
tions of the manufacturer and supplier of the
attachment.
–
Observe the residual load capacity rating
plate; see the chapter entitled "Picking up a
load using attachments".
6219_003-056
1
Operating
4
Attachments
311
56368011501 EN - 04/2022 - 13
Summary of Contents for RX20 14-20
Page 2: ......
Page 16: ......
Page 17: ...1 Foreword ...
Page 25: ...Foreword 1 Your truck 9 56368011501 EN 04 2022 13 ...
Page 45: ...2 Safety ...
Page 63: ...Safety 2 Residual risk 47 56368011501 EN 04 2022 13 ...
Page 78: ...Safety 2 Emissions 62 56368011501 EN 04 2022 13 ...
Page 79: ...3 Overviews ...
Page 80: ...Overview Overviews 3 Overview 64 56368011501 EN 04 2022 13 ...
Page 82: ...Driver s compartment Overviews 3 Driver s compartment 66 56368011501 EN 04 2022 13 ...
Page 97: ...4 Operating ...
Page 518: ...Operating 4 Decommissioning 502 56368011501 EN 04 2022 13 ...
Page 519: ...5 Maintenance ...
Page 547: ...Maintenance 5 Preserving operational readiness 531 56368011501 EN 04 2022 13 ...
Page 554: ...Maintenance 5 1000 hour maintenance annual maintenance 538 56368011501 EN 04 2022 13 ...
Page 555: ...6 Technical data ...
Page 599: ......