background image

 17 West St., W. Hatfi eld, MA 01088 

|

 800.582.8423 

|

 413.247.3380 

|

 fax 413.247.3369 

|

 [email protected] 

|

 www.stiebel-eltron-usa.com

Simply the Best

INSTALLATION INSTRUCTIONS 

SOL 27 PREMIUM S & W COLLECTORS - 230016 & 230017

3 Assembly 

instructions

3.1 Important Information

!

 

WARNING: RISK OF SCALDING. TO PREVENT THE 
SOLAR FLUID FROM BOILING IN THE COLLECTORS, 

THE SYSTEM SHOULD NOT BE FLUSHED OR FILLED DURING 
PERIODS OF STRONG SUNSHINE.

System Pressure

Regularly check the pressure gauge of the heat transfer 
circuit at the pump station. The pressure should range 
between 30-70 psi during all operating times. If the system 
is above or below this pressure, troubleshooting may be 
required.

After-heating Backup

The backup heater should be of adequate capacity to 
provide suffi cient hot water. The backup water heater must 
be certifi ed, listed, and labeled by an accredited safety 
certifi cation organization.

Expansion Tank

An expansion tank must be included in the solar loop, and 
is typically connected via the dedicated expansion tank 
connection on the pump station. The expansion tank should 
be sized according to standard design practices. More 
information about expansion tank sizing can be accessed via 
the expansion tank users manual.

!

 

IMPORTANT: TO PROTECT THE SYSTEM AGAINST 
FROST AND CORROSION, FILL THE SOLAR SYSTEM 

EXCLUSIVELY WITH THE RECOMMENDED PROPYLENE GLYCOL 
MIXTURE.

4 Installation 

Instructions

4.1 Planning and Installation

Pipework Installation

Use copper or stainless steel pipes or corrugated stainless 
steel hoses for the supply and return lines. Pipe diameter 
is depended on length of run and expected fl ow rates. 

Recinnebded pipe diameter for systems of up to eight 
collectors is ¾˝. If the pipe run is longer than 60 feet, a 
larger pipe diameter may be needed.

Vent tiles are recommended for pipe run penetrations 
into the roof. On fl at roofs and roofs with shallow pitches, 
passing the pipes through an external wall is recommended 
to  avoid water leaks. Pipe hangers must provide correct 
support and pitch and must meet building codes. Hangers 
must not comporess insulation and should allow for thermal 
contraction and expansion of the pipework. Installers must 
comply with all Local, State and National Codes.

We recommend trimming pipes with pipe cutters to avoid 
creating metal fi lings. Electrically ground the pipework in 
accordance with electrical codes. Connect all pipework to 
the building's ground over the shortest possible distance.

Soldered Pipe

Soldered pipe must be hard-soldered using 95/5 lead-free 
solder.

Alternative Piping

Piping made with locking ring fi ttings, press fi ttings, 
and corrugated hoses must be sealed using suitable 
sealants. Seals must be resistant to propylene glycol and 
temperatures up to 356

F.

Rated Volumetric Flow Rate

The rated volumetric fl ow rate for a collector array (max. 5 
collectors) is 0.25 - 1.25 gpm, but it is recommended to be 
0.75 gpm. The fl ow rate for every additional collector array, 
so in a system of 3 x 3 collectors, the fl ow rate would be 
2.25 - 11.25 gpm, but Stiebel Eltron would recommend 6.75 
gpm.

Summary of Contents for 230016

Page 1: ...OPERATION AND INSTALLATION HIGH PERFORMANCE FLAT PLATE COLLECTOR SOL 27 PREMIUM S SOL 27 PREMIUM W CLICK ANYWHERE on THIS PAGE to RETURN to SOLAR HOT WATER GUIDES at InspectApedia com...

Page 2: ...instructions or improper use voids the warranty Save these instructions for future reference Installers should leave these instructions with the consumer If you have any questions regarding the insta...

Page 3: ...E ORIGINAL CLASSIFICATION OF THE SYSTEM UNAU THORIZED ALTERATIONS TO THIS SYSTEM COULD RESULT IN A HAZARDOUS CONDITION AND COULD VOID THE MANUFACTURER S WARRANTY Shut down Except for repair and or eme...

Page 4: ...ght 85 5 2171 mm 46 1 1171 mm Width 46 1 1171 mm 85 5 2171 mm Depth 3 8 96 mm 3 8 96 mm Weight 88 2 lb 40 kg 89 3 lb 40 5 kg Casing material Aluminum corrosion resistant Glass cover ESG Glass thicknes...

Page 5: ...llation Pipework Installation Use copper or stainless steel pipes or corrugated stainless steel hoses for the supply and return lines Pipe diameter is depended on length of run and expected ow rates R...

Page 6: ...e nighttime winter temperatures below 30 F may need thicker pipe insulation to prevent pipe freeze ups or slushing of the antifreeze mixture Minimum Insulation Thickness Diameter of Pipe Minimum thick...

Page 7: ...re it is seated in the groove of the collector trim at the top and in the bottom groove of the collector 5 When the grip is positioned correctly tighten the xing screws 6 Attach the remaining grips on...

Page 8: ...TO ONE ANOTHER IF THE SPACER IS REMOVED BEFOREHAND THE CONNECTOR MAY BE DAMAGED WHEN THE SECOND COLLECTOR IS PUSHED INTO PLACE Inter panel connector Spacer Connecting clip 1 Insert the plug in connec...

Page 9: ...en collector and plug in connection 3 Secure the connecting clip by pushing down on the locking tab 4 Install the inlet of the collector array in the same manner Collector Sensor The correct connectio...

Page 10: ...ews in accordance with DIN 571 at least 10 x 80 of stainless steel per collector If multiple arrays of collectors are being installed on a at roof one behind another the recommended spacing between th...

Page 11: ...arrays either SOL 27 Premium S or W panels can be used Use the following pictures and tables for reference when determining how to install your tilt mount collectors Flush Mount Vertical Side by side...

Page 12: ...k 30 60 560203 0 1 1 1 Horizontal X Brace 560206 0 0 1 2 Double Mounting Frame 230170 1 2 3 4 Frame Connector Kit SFC 001 0 1 2 3 Mounting L Bracket Flashing Kits Asphalt 560104 L 4 8 12 16 S5U L 102...

Page 13: ...e and isolation valve Flow Meter S Temperature Sensor T Thermometer Expansion Tank Air Fill Valve Disconnect Valve Solar Collectors S2 S3 T S4 Solar Storage Tank Coil in tank Heat Exchanger mixing val...

Page 14: ...ts that are coated with soapy water and watching the pressure gauge over time Bear in mind that the pressure gauge will vary some based on temperature of the air so one must try to read the pressure a...

Page 15: ...e collector framewall or absorber plate 5 To glass breakage 6 To conditions resulting from the introduction of harmful chemicals caustic uids or liquids deleterious to copper tubing including improper...

Page 16: ...WKH 65 7KLV DZDUG RI FHUWLILFDWLRQ LV VXEMHFW WR DOO WHUPV DQG FRQGLWLRQV RI WKH 3URJUDP JUHHPHQW DQG WKH GRFXPHQWV LQFRUSRUDWHG WKHUHLQ E UHIHUHQFH 7KLV GRFXPHQW PXVW EH UHSURGXFHG LQ LWV HQWLUHW 2 7...

Page 17: ...KH 65 7KLV DZDUG RI FHUWLILFDWLRQ LV VXEMHFW WR DOO WHUPV DQG FRQGLWLRQV RI WKH 3URJUDP JUHHPHQW DQG WKH GRFXPHQWV LQFRUSRUDWHG WKHUHLQ E UHIHUHQFH 7KLV GRFXPHQW PXVW EH UHSURGXFHG LQ LWV HQWLUHW 2 72...

Page 18: ...site Site System operator Installation site Collectors Collectors number type Collector surface area System speci cations System height Pipe run length Ventilation Solar uid type concentration Max ow...

Reviews: