Operating Manual
RC-3030
33
CLC #3
3
#3 is a 3” resin bonded tool that has the pictured face design and can be clearly identified by
the number on back as “#3.” This tool features red Velcro backing. The tool is run wet.
Approximate life of #3 is 15,000 SF / 1,394 M
2
.
CLC #4
4
#4 is a 3” resin bonded tool that has the pictured face design and can be clearly identified by
the number on back as “#4.” This tool features red Velcro backing. The tool is run wet.
Approximate life of #4 is 15,000 SF / 1,394 M
2
.
CLC #5, #6, & #7
5
7
6
#5, #6 & #7 are 3” resin bonded tools that each have the pictured face design and
can be clearly identified by the number on back as “#5”, “#6” & “#7.” These tools
feature red Velcro backing. The tool is run dry.
Approximate life of #5 & #7 is 12,000
SF / 1,115 M
2
each. Approximate life of #6 is 10,000 SF / 930 M
2
each.
Execution of CLC Polishing System
1. Attach the CLC #1 tools to the P/M machine and place it in operating position. Attach appropriate
power* and vacuum dust collection hose to the P/M machine. With 50% of weights on head of machine
and 50% in basket over wheels, set speed to 35Hz on VSD and start machine (for propane, run at 2200
RPM). Upon satisfactory completion of step #1, remove machine from area and vacuum the surface.
2. Attach the CLC #2 tools to the P/M machine and place it in operating position. Attach appropriate
power* to the P/M machine. With 50% of weights on head of machine and 50% in basket over wheels,
set speed to 45Hz on VSD and start machine (for propane, run at 2500 RPM), add water and start the
machine. Upon satisfactory completion of step #2, remove machine from area and wet vacuum or
auto-scrub the concrete clean.
3. Apply densifier per manufacturer’s recommendations and allow surface to dry completely after
densifier process has been completed. See Section 3 for further information about densifiers.
4. Attach the CLC #3 tools to the P/M machine and place it in operating position. Attach appropriate power*
to the P/M machine. With 50% of weights on head of machine and 50% in basket over wheels, set
speed to 45Hz on VSD, add water, and start machine (for propane, run at 2500 RPM). Upon satisfactory
completion of step #3, remove machine from area and wet vacuum or auto-scrub the concrete clean.
5. Attach the CLC #4 tools to the P/M machine and place it in operating position. Attach appropriate
power* to the P/M machine. With 50% of weights on head of machine and 50% in basket over wheels,
set speed to 45Hz on VSD and start machine (for propane, run at 2500 RPM), add water and start the
machine. Upon satisfactory completion of step #4, remove machine from area and wet vacuum or
auto-scrub the concrete clean.
6. Attach the CLC #5 tools to the P/M machine and place it in operating position. Attach appropriate
power* and vacuum dust collection hose to the P/M machine. With 100% of weights on head of
machine, set speed to 50Hz on VSD and start machine (for propane, run at 2700 RPM). Upon satisfactory
completion of step #5, remove machine from area and vacuum the surface.
7. Apply densifier per manufacturer’s recommendations and allow surface to dry completely after
densifier process has been completed. See Section 3 for further information about densifiers.
8. Attach the CLC #6 tools to the P/M machine and place it in operating position. Attach appropriate
power* and vacuum dust collection hose to the P/M machine. With 100% of weights on head of
machine, set speed to 50Hz on VSD and start machine (for propane, run at 2700 RPM). Upon satisfactory
completion of step #6, remove machine from area and vacuum the surface.