Assembly ridge sheet
Completely mounted ridge sheet right.
Pay attention that the ridge sheet engages completely (audibly)
over the EPDM-profile of the collector and that the lateral
connection is pushed over the lateral sheet.
Insert the next ridge sheet in the previous one.
Proceed in the same way with every following collector. The
last collector in a row has to be completed with the ridge sheet
on the right side.
Completely mounted ridge sheet left.
The support sheets for the next collector are already mounted
and fixed.