Fully assembled eaveplates.
Depending on the number of the collectors the next eave plate
extensions and accordingly the eave plate must be mounted
and fasten on the right side.
If the installation of collectors on roofs with flat roof, for
example, slate, shingle or Prefa, can be installed to
support the eave plate can be installed an additional
lath under the eave plate.
Flat roof tiles with a maximum of 15mm profiling where the
grooved rolled lead cannot be shaped:
In this case it is necessary to fixate the lead rag with a rever
-
sible butyl tape on the covering. Alternatively the lead rag can
be cut off if the eaves sheet overlaps the covering more than
10cm.
Assembly eaves sheet
Summary of Contents for FKF 200
Page 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Page 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Page 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Page 45: ...45 Notes Initial operation...
Page 46: ...46 Notes Initial operation...