36
Assembly ridge sheet
Completely pre-assembled support sheets and bottom parts of
ridge sheets.
Start on the left side when mounting the ridge sheets.
First insert the ridge sheet on the left side into the left lateral
sheet. Afterwards, the ridge sheet is pushed over the sealing
lip.
Ensure that the support sheets are not slipping during the
assembly.
Completely mounted ridge sheet left.
Pay attention that the ridge sheet engages completely (audibly)
over the EPDM-profile of the collector and that the lateral
connection is pushed over the lateral sheet.
With a soft pressure on the ridge sheet border the sheet can
completely be enganged over the EPDM-frame which is fully
covered if the ridge sheet has been correctly installed.
Summary of Contents for FKF 200
Page 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Page 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Page 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Page 45: ...45 Notes Initial operation...
Page 46: ...46 Notes Initial operation...