18
Assembly of the solar collectors
After placing the first collector the following collector is placed
at a distance of 10 to 20 cm beside the first collector.
The hydraulic collector connector must be mounted now on the
first collector.
Afterwards the following collector must be carfully pushed until
the hydraulic collector connectors engage into the collector
connection.
The collector connection plates provided ensure the correct
distance of the collectors. It is importend to ensure that the
clamping plates are not mount.
Secure the hydraulik connector also with the fastening clip.
Repeat this for all collectors and connections in a row.
After that the adjustment and fastening of the collectors starts.
Take care that the collectors have the same alingnment. (String)
Summary of Contents for FKF 200
Page 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Page 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Page 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Page 45: ...45 Notes Initial operation...
Page 46: ...46 Notes Initial operation...