Collector field dimensions
Vertical section across a collector field
In case of multi-row installations the
collectors will always be mounted
on joint on top of each other . The
lip (collector cover) of the upper
collector has to be put onto the
lower collector. The lip (collector
cover) of the lower collector has to
be clamped in the joint area so that
an optimum water flow is ensured.
Field height
Horizontal section across a collector field
Collectors that are mounted side by
side in one row are always connected
by means of stainless steel
expansion joints on the manifolds.
(view photo)
1300001 Collector connection set hydraulical
1910001 Tool set
Field width
Lip (Collector cover)
It is possible to assemble metal sheets between the collectors to achieve a homogeneous appearance of the installation.
The distance metal sheets are assembled exclusively for optical aspects and do not have any influence on the installation.
Therefore the distance metal sheets can be ordered optionally and are not necessarily included in delivery.
Tighten the screw on the clamp only manually. The usage of
cordless screwdrivers or the like may lead to damages of the thread
of the clamp. Tighten the clamp until the two lugs are superimposed
in the whole length.
Summary of Contents for FKA 240 Series
Page 1: ...1 Assembly Instructions Solar collectors FKA 240 270 Roof mounted installation...
Page 36: ...36 Initial operation 0 1 2 3 4 2 5 3 6 7 8 9 6 1 0 3 1 6 2 3 6 6 5 5...
Page 37: ...37 Initial operation Schematic drawing of the system construction and piping scheme...
Page 38: ...38 Initial operation Notes...