
SSDK12M - SSDK16M - SSDK20M
15
Refer to engine owners handbook supplied with each generator for further information.
(A)
"FULL"
(B)
"LOW"
Once all the
pre-start checks
have been made you can then start the generator. Follow the procedure below:
Press the button until the is displayed on the LCD screen.
A red LED flashes above the button.
Check Fuel Level
Control Panel Checks
Fig.9
It is recommended to check the water/coolant level of the radiator BEFORE EVERY START OPERATION - Ref.
Fig.9.
The radiator is provided with a recovery tank (expansion vessel) , check the water/coolant is between the
"FULL" and "LOW" marks - Ref. Fig.9.
While the generator is at standstill you will notice the fuel gauge on the control panel will be showing empty
"no fuel".
To check the fuel level in the generator fuel tank you can
energise
the fuel gauge by
pressing and holding
the
fuel pump prime button
on the control panel - see Fig.2 & 3.
Check Coolant Level
(1)
Recovery tank
(expansion vessel)
This is a basic operation guide, refer to the
DSE 3110 Control Module - Overview
within this handbook for an
in-depth view/use of the DSE 3110 control module.
While holding down the fuel pump prime button you should be able to see the gauge needle rise and rest to
indicate a level, also you should hear the fuel pump operating.
Ensure the all main MCB's are in the "OFF" position (switch down) - Ref Fig.3.
WARNING
- Never try to start
the generator with load connected.
Press the button once more, the icon rotating will be displayed on
the LCD screen. This will continue to rotate for approximately 10 seconds.
The generator will then crank and start.
Starting the Generator - Manual Start