![Stellar Hearth Products 3-IDOD-2-GL Installation And Operating Manual Download Page 35](http://html1.mh-extra.com/html/stellar-hearth-products/3-idod-2-gl/3-idod-2-gl_installation-and-operating-manual_1371586035.webp)
Page 35
16400-7820 GIDOD REV A
Q. WALL TERMINATION - WITH AND WITHOUT DAMPER
8 - VENTING
USE APPROPRIATE HEAVY DUTY FASTENERS
TO SECURE POWER VENT
DRILL 1/4” HOLES
TO MATCH POWER VENT BASE
ACCESS PANEL
NEEDED FOR FUTURE
DAMPER SERVICE
INSULATION PAD
MUST BE CUT IN CENTER TO
ACCOMMODATE VENT SIZE
MECHANICAL FLUE DAMPER
Figure 8Q.2
DRILL 1/4” HOLES
TO MATCH POWER VENT BASE
USE APPROPRIATE HEAVY DUTY FASTENERS
TO SECURE POWER VENT
INSULATION PAD
MUST BE CUT IN CENTER TO
ACCOMMODATE VENT SIZE
Figure 8Q.1
FRAMING:
8" = 11-3/4" W X 11-3/4" H
10" = 13-1/4"" W X 13-1/4" H
W
H
Wall Termination Without
Optional Mechanical Damper
Wall Termination With
Optional Mechanical Damper
OPTIONAL
Summary of Contents for 3-IDOD-2-GL
Page 32: ...INS_CUST UL REV E Page 32...