![Stellar Hearth Products 3-IDOD-2-GL Installation And Operating Manual Download Page 33](http://html1.mh-extra.com/html/stellar-hearth-products/3-idod-2-gl/3-idod-2-gl_installation-and-operating-manual_1371586033.webp)
Page 33
16400-7820 GIDOD REV A
O. VERTICAL VENT CAP LOCATION AND CLEARANCES
ROOF PITCH
H (Min.) Ft.
H (Min.) M.
FLAT TO 6/12
1.0*
0.30
OVER 6/12 TO 7/12
1.25*
0.38
OVER 7/12 TO 8/12
1.5*
0.46
OVER 8/12 TO 9/12
2.0*
0.61
OVER 9/12 TO 10/12
2.5*
0.76
OVER 10/12 TO 11/12
3.25*
0.99
OVER 11/12 TO 12/12
4.0
1.22
OVER 12/12 TO 14/12
5.0
1.52
OVER 14/12 TO 16/12
6.0
1.83
OVER 16/12 TO 18/12
7.0
2.13
OVER 18/12 TO 20/12
7.5
2.27
OVER 20/12 TO 21/12
8.0
2.44
* = 3 foot minimum in
snowy regions
H
24” MIN
(610MM)
24” MIN*
(610MM)
* = 24” TO A COMBUSTIBLE SIDE WALL
12” TO A NON-COMBUSTIBLE SIDE WALL
IMPORTANT: ALL DIMENSIONS ARE FROM THE
EDGE OF THE CAP
8 - VENTING
Figure 8O
Summary of Contents for 3-IDOD-2-GL
Page 32: ...INS_CUST UL REV E Page 32...