I N S T A L L A T I O N
Clearance guidelines
There is no minimum clearance on both side of the ACA distribu on panel, but it is a good
prac ce to have a clearance of 4 to 8 in [100 to 200mm] for ease of installa on and service
Allow a minimum clearance of 24in [60cm] with ceiling.
Front clearance of 8-1/2 [2.5m] in front of nozzle is required to avoid any uninten onal
we ng on surfaces, equipment, wall, or people.
It is a good prac ce to install ACA in space distribu on panel where ceiling height is 9
[2.7m]minimum
Mounting holes positions
Figure 5 – ACA distribu on panel moun ng holes posi on
General guidelines for Mounting
CAUTION. Risk of malfunc on.
ACA distribu on panel must be levelled in X & Z axis.
Installa on on wall
1. Verify that wall structure and strength is appropriate to support the weight of the
ACA distribu on panel.
2. Mark the wall or support according to the holes loca on as per the above figure , and
drill 4 holes to the wall or support as per the size of anchors and/or screws.
3. Use anchors of sufficient size (at least 1/4in [6mm]). Insert those anchors and the 2 top
screws. Then hung the
ACA
distribu on panel onto the 2 top screws.
Ensure that the humidifier is properly levelled.
4. Insert the 2 bo om screws and ghten them up. Re verify the level in the 2 direc on X
and Z axis.
1. Tighten the 4 screws.
12