
I N S T A L L A T I O N
Typical installation in-space
overview
General
1. Installa on of this atomizing humidifier should be carried out by trained and qualified
personnel.
2. Any work related to installa on of this atomizing humidifier must comply with local
code and regula on regarding safety and preven on of accidents.
WARNING. Risk of electric shock.
Power supply must be disconnected during installa on.
Main power should be connected only a er all installa on steps have been
completed and properly verified.
5
3
4
1
2
Figure 3 –ACA typical installa on
installation steps :
Posi oning& moun ng of ACA in space distribu on panel
Water supply installa on
Compressed air installa on
ACA control panel installa on
RH% control installa on
10
section
3