
Brace Sides
2
#S07
#S06
QTY
QTY
4
Cable Connector
Cable
QTY
1
Hex Key
From the inside of the greenhouse, insert long side of cable connector
S06 into profile channel L07B with hook facing the front. Slide
connector to other side of channel. Use hex key to
securely tighten and hold in place.
Repeat step 9.1 inserting cable connectors S06 into profile L07B with hook facing the back and into
profile L01C with hook facing the front. Cable rests behind profile L14A. Slide connector until profile
corners are square and cable is tight. Use hex key to securely tighten second connector and hold in place.
!
Place all the parts for bracing the sides on a level surface.
Make sure the pieces are in the correct positions before assembling.
Please carefully follow the order of assembly to ensure an easy installation.
Wear proper safety gear including shoes, gloves and goggles.
Attach one side of long cable S07 to hook and lace behind profile L14A. Attach other side of cable to
a second S06 cable connector. With hook facing the back, insert connector into profile channel L01C.
9.1A
9.1B
9.1C
Push towards center until profile corners are square and cable is tight.
Use hex key to securely tighten and hold in place.
9.2
L01C
L03A
42 of 55
www.stcny.com
VIEWS FROM INSIDE.
VIEWS FROM INSIDE.
IMPORTANT: Make sure all corners are squared at 90 degrees.
L01C
L03A
L02B
L01C
L07B
L03A
L07B
L02B
IMPORTANT: Make sure all corners
are squared at 90 degrees.
IMPORTANT: Make sure all corners
are squared at 90 degrees.
L14A
L01C
L03A
L07B
L02B
L14A
L01C
L03A
L07B
L02B