S01
3.9A
3.9B
Secure S01 connector to profiles L06A and L06K with S02 screws.
As you slide bottom profiles L01L and L01K half way into place, carefully line up S01
connectors with channels on profiles L06K and L06A and S04 and S05 connectors
with profiles L02B and L02A. Continue sliding, making sure panels Y6 and Y5 fit
into V-channels. Snap connectors S04 and S05 securely into profiles.
QTY
2
#S02
Screw
There is only one way to properly fasten connectors into profiles. Line up parts
first to ensure correct placement. Slide connectors until they CLICK securely into
profile. Use WD40 or liquid soap if pieces do not easily slide together. Wear gloves.
!
25 of 55
www.stcny.com
NOTE: ALL VIEWS ARE FROM INSIDE.
Connectors S04 and S05 CLICK into place.
L06A
L01L
S05
S05
L06A
L01L
S05
S01
S01
S04
L01K
L01L
Y6
Y5
L02B
L06K
L06A
L02A
L06A
L01L
S02