ASSEMBLY INSTRUCTIONS
Push
PEDAL BUSHINGS(37),
with
SHOULDER
facing outside, into
LINKAGE CONNECTORS(39).
Insert
PEDAL SHAFTS
of
PEDALS(82, 83)
through
SHOULDER
side of
PEDAL BUSHINGS(37).
Slide
SPACERS(84)
onto
PEDAL SHAFTS.
WARNING:
SPACER(84)
must be between
PEDAL BUSHING(37)
and
CRANK(9)
so that there will be
enough clearance between
LINKAGE(8)
and
CRANK(9).
Thread
PEDAL SHAFTS
of
PEDALS(82, 83)
into
CRANK(9)
and tighten.
Hold
PEDAL SHAFTS
and thread
THIN NUTS(1/2")(41)
onto
PEDAL SHAFTS.
Tighten
PEDAL SHAFTS
and
THIN NUTS(1/2")(41)
until
THIN NUTS(1/2")(41)
are tight against
CRANK(9).
Connect the
LINKAGES(8)
to the
LINKAGE CONNECTORS(39)
with the
LOCKING PINS(40).
a.
b.
c.
d.
e.
f.
g.
The
RIGHT PEDAL(83)
has
R
marked on the bottom side of the pedal. The
LEFT PEDAL(82)
has
L
marked on the bottom side of the pedal. Both
PEDALS(82, 83)
have
RIGHTHAND
THREADS.
Tighten both
PEDALS(82, 83)
by turning clockwise.
STEP 8
NOTE:
IMPORTANT
STUDY THE ABOVE ILLUSTRATION AND READ ALL OF STEP 8 "a" through "g"
BEFORE ATTACHING PEDALS AND CONNECTING LINKAGES.
STEP 9
Open the
MONITOR(53)
to Install two AA batteries. Run the
SPEED PICKUP WIRE(24)
through the
hole on the Back Cover of the
MONITOR(53)
and plug into the
MONITOR(53).
Insert
MONITOR(53)
into the Back Cover. Attach the
MONITOR(53)
to the
BRACKET(52)
on the
MAIN FRAME(1).
8
Summary of Contents for 0890 Air Bike
Page 18: ...PRODUCT PARTS DRAWING 18 FRONT BACK...
Page 21: ...NOTES 21...