TANK REMOVAL OF REPLACEMENT
TANK REMOVAL
TANK INSTALLATION
1. Before beginning to insert the tank, unscrew the
APS 71 pump fixed protection away from the pump.
2. Place the tank (J). Look for the direction in (E) for the
tank to be successfully placed fit to the frame (this is
only applies if the APS71 pump (I) is attached).
3. Once the tank (J) successfully placed on the frame,
find the two(2) hoses that connects the APS71 pump
with the tank along with all the nipples and elbow;
4. Connect the HPR Control Valve (B) hose directly to
the tank along with all the nipples and elbow;
5. Afterwards connect all two(2) hoses from the HPR
Control Valve (B) to the main sprayhead (L) along
with all the nipples and elbow.
6. Screw the filter (D) at the bottom along with all it’s
nipples and elbow.
7. Attach the level gauge (H) at the designated area on
the tank surface with it’s nipple and elbow.
8. Make sure to include the drain cap (K) in order to
secure the water inside the tank.
9. Screw the tanklid on top of the opening on the tank
The tank removal process is somewhat similar to that of
installation process. Simply reverse the steps taken
from no. (1) till (8)
In order for the steps to be identified correctly please
refer to the Diagram 1.
Diagram 1
ST101-GEO-i 400 / 600 LITER
- Tractor Mounted
E
F
J
Diagram 1