WWW.SSTCOMM.COM
18
Note:
1. Some HART slave instrument need to perform self-test and other internal work when power is on, they
may not start HART communication, then gateway cannot receive the response data of the instrument right now. It
is recommended the HART slave instrument and gateway uses separate power supply so that the gateway can
immediately establish communication with instrument.
2. When configuring HART commands in the software SST-HT-CFG, the commands need to be
configured according to the actual demands. To improve the speed of bus communication, it is recommended not
to configure the empty node (in fact, not connected to the node) and empty commands (the actual unnecessary
commands).
Summary of Contents for GT200-HT-RS
Page 10: ...WWW SSTCOMM COM 10...
Page 17: ...WWW SSTCOMM COM 17 3 5 Topology of GT200 HT RS and Fieldbus Devices...
Page 43: ...WWW SSTCOMM COM 43 After clicking Upload data it will show uploading succeeded...
Page 44: ...WWW SSTCOMM COM 44...
Page 52: ...WWW SSTCOMM COM 52 Installing the gateway Uninstalling the gateway...