SCB-PT
18
3.3 Line connection
Before the circuit connection, the controller should be within 3 m from
the robot or PLC, and the DB9 serial port line or USB-B data line should
be installed firmly when debugging or communicating the controller.
When the circuit is connected, ensure that the male parent of the
aviation plug is connected firmly and the lock nut is tightened.
The
connection of aviation plug is 14 - core cable. When connecting, it is
necessary to carefully read the input and output of 2.3 to ensure that the
connection is correct.
After the circuit connection, press the power switch, try to run the
controller three to five times, after the normal function can continue to
use. Once a functional error occurs, the line is immediately turned off to
check whether the connection is normal and can continue to use after
troubleshooting.
The following figure is the schematic diagram of circuit connection:
Communication Cable
Computer
SCB-PT controller
Robot
Aviation plug cable