
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
T: +86 0755-26458295
F: +86 0755-27325578
Page 36 of 51
File version: V1.0
NO. Parameter name
allow
adjustment
Settings
(
default
)
Description
[05]
Utility to Battery
Power Setpoint
26.4V
When the parameter [01] =SOL/SBU,
the battery voltage is higher than the
set value, and the output is switched
from the mains to the inverter. Setting
range: 24V~30V.
[06]
Charger source
priority
CSO
PV priority charging; only when the
PV charging fails, the mains charging
is started.
CUB
Mains priority charging; only when the
mains charging fails, the PV charging
is started.
SNU
PV and Mains hybrid charging; PV
charging is a priority, and when the
PV energy is insufficient, the Mains
charging supplements. When the PV
energy is sufficient, the Mains
charging stops. Note: Only when the
Mains bypass output is loaded, the
PV charging and the mains charging
can work at the same time. When the
inverter works, only the PV charging
can be started.
OSO
Only PV charging, with the Mains
charging not activated.
[07]
Max charger
current
60A
Setting range: 0~80A;
[08]
Battery Type
LF07
7 strings LFP battery, charge voltage
is 24.8V
LF08
8 strings LFP battery,charge voltage
is 28.4V
LF09
9strings LFP battery,charge voltage is
31.8V
NCA
7 strings NCM battery, charge voltage
is 28.4V