
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
T: +86 0755-26458295
F: +86 0755-27325578
Page 23 of 51
File version: V1.0
According to the hole position, drill 2 holes on the ground and 4 holes on the wall, φ8, depth 45~50mm. Tap
the M8 screw into the above hole and screw on the nut.
5.4.3 Mounting the base
Fasten the base to the expansion screw.
5.4.4 Install Battery Pack
CAUTION
Place the battery on the base, and then tighten the fixing screws on both sides.
Install the second battery in the same way. After the installation is complete, install the wall fixing bracket.
The battery pack is very heavy, which requires multiple people to install.