
SRNE Solar Co., Ltd.
4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China
T: +86 0755-26458295
F: +86 0755-27325578
Page 21 of 51
File version: V1.0
● The energy storage cannot be installed forwardly, horizontally, inversely, backwardly or sideways.
● When drilling holes on walls or ground, the goggles and protective gloves shall be worn.
● During drilling, the device should be shielded to prevent debris from falling into the device. After drilling,
the debris shall be cleaned up in time.
● When handling any heavy objects, you should be prepared to bear loads to avoid being crushed or
sprained.
● When handling the device by hand, wear protective gloves to avoid injury.
<18kg
18kg~32kg
32kg~55kg
>55kg
5.3.2 Installation Space Requirements
When installing the energy storage, certain space shall be left around it to ensure sufficient space for
installation and heat dissipation.