4.2 Load Working Mode
Load working mode
Inverter setting
Description
PV priority mode
SOL
switching to the Mains when the PV fails or the battery is lower
than the set value of parameter
Mains priority mode
UTI
Mains priority mode, switching to inverter only when the mains
fails.
Inverter priority mode
SBU
switching to the mains only when the battery is under voltage or
lower than the set value of parameter
5 System Installation
5.1 Inspections before Installation
Inspection of outer package
Before opening outer package of the energy storage, check if there is any visible damage on the outer
package, such as holes, cracks or other signs of possible internal damage, and check the type of energy storage.
If there is any abnormality on the package or model of the energy storage is inconsistent, do not open it and
contact us as soon as possible.
Inspection of deliverables
After opening outer package of the energy storage, check if the deliverable is complete and whether there is
any visible external damage. If any items are missing or damaged, please contact us.