Waukesha Cherry-Burrell
Maintenance
October 2005
95-03057
Page 39
Routine Maintenance Checklist -
Horizontal Votator II
1. Tools required:
•Rubber or plastic mallet
•Large adjustable wrench (2-3/8 inch) or WCB model
79-2 Sanitary Wrench for removing the shaft locknut
•Two adjustable or open-end wrenches (15/16 inch)
for removing the bearing clamp on the non-driven
head
•One 3/8 inch nut driver and one common screwdriver
for removing the shaft guard on the drive end
•One small common screwdriver for removing the
keeper o-ring on the seal
2. Lock out power.
3. Drain product piping and disconnect.
4. Loosen latch on bayonet lock and disengage head by
rotating clockwise.
5. Lift head and pull assembly out about 1 inch, and rest
the shaft on the heat transfer tube.
6. Remove the hinged clamp and bearing cap.
7. Remove shaft locknut (
left hand threads
).
8. Firmly support the product head and carefully remove
it from the mutator shaft.
9. Insert plastic shaft skid in unit, install on top and
rotate shaft so skid is under shaft. Remove both shaft
and skid from unit. Place on a table or cradle.
10. Remove product head on drive end (if required) by
removing the shaft guard held in place by four bolts.
Rotate the head counter-clockwise to disengage.
Check the condition of the o-ring in the head before
reinstalling.
11. The mechanical seals are the same on top and bottom,
and if servicing is required:
•Remove the keeper o-ring and all seal components,
seal body with seal ring, backing ring, u-cup and
wavy spring. If it is a double mechanical seal, the
secondary seal and spring must be removed before
disassembling the primary seal.
•Inspect o-rings and seal faces for scratches or cracks.
If the seal parts require replacement, refer to pages 52
and 64 or pages 53 and 66.
•When assembling the
single mechanical seal
, place
the wave spring on the shaft, followed by the seal
backing ring and the u-cup with the opening of the
cup facing the body of the shaft. Position the seal
body and install the keeper o-ring.
•When assembling the
double mechanical seal
, place
the wave spring on the shaft and then the seal body
with o-ring. Position the seal body and install the
keeper o-ring, followed by the secondary seal and
wave spring.
•Check all seal assemblies to verify that they are
locked in position by the drive pins and that they can
be easily compressed.
12. Inspect the condition of the scraper blades and replace
if necessary. Install the new blades while the shaft is
on the cradle or table, attaching two rows of scraper
blades on the top of the mutator, and place the shaft
skid over the blades. Turn the mutator and shaft skid
over so that the skid is on bottom of the table or
cradle, and install the other two rows of blades on top.
Blades are always installed with the flat side up.
13. Use the shaft skid to slide the mutator in the heat
exchanger cylinder and lift up the mutator slightly to
remove the shaft skid.
14. Check the condition of the o-ring in the product head
and carefully place the product head with bearing on
the mutator shaft.
The grease ring on the bearing
should be facing the product side of the head.
15. Seat bearing in head using a plastic mallet, if required.
16. Install shaft locknut and bearing cap, position product
head over bayonet ring and turn counter-clockwise.
Close locking latch.
17. Grease bearing. (Not required for Extra Heavy Duty
Votator II.)
Summary of Contents for Waukesha Cherry-Burrell Votator II
Page 64: ...Parts Lists Waukesha Cherry Burrell Page 64 95 03057 October 2005 Single Mechanical Seal...
Page 66: ...Parts Lists Waukesha Cherry Burrell Page 66 95 03057 October 2005 Double Mechanical Seal...
Page 75: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page75 Vertical Refrigeration System...
Page 76: ...Addendum Waukesha Cherry Burrell Page 76 95 03057 October 2005 Horizontal Frame Options...
Page 78: ...Addendum Waukesha Cherry Burrell Page 78 95 03057 October 2005 Vertical Hydraulic Schematic...
Page 83: ......