Waukesha Cherry-Burrell
Operation
October 2005
95-03057
Page 37
Shutdown Procedure
These instructions are general and should be used only as a
guide. It may be necessary to modify them to conform to
actual in-plant requirements. Changes should be
documented by plant personnel. Emergency Shut-Down
procedures should be documented by plant personnel after
assessing system-wide requirements.
CAUTION:
The steam or refrigeration supply
valves must be shut off BEFORE stopping product
flow. Failure to do this could result in product burn-
on or freezing in heat exchanger cylinders.
Where product characteristics permit, shut off the mutator
shaft, the media flow and the pump. Otherwise, it may be
necessary to heat or cool the product to ambient
temperature to avoid burn-on or freeze-up.
In instances where product goes to a filler, it may be
necessary to provide a surge tank or a recirculation line.
With continuous operations, a steam line connected to the
product line can enable steam to soften and remove
product in the tube at shut down.
The final option is to have hot water chase product from
the tube at the end of the run.
Preventing Tube Scoring
Scoring of the heat exchanger tube can have many causes.
The most common are temperature extremes, material
problems in the heat exchanger tube, or units operated
without product or CIP flow.
The following suggestions will help prevent tube scoring:
•
Do not pump cold product into a unit that is still hot
from cleaning (this can cause temporary bowing of
the tube). Wait until the tube has cooled before
running cold product.
•
Do not leave sterilizing water or solution in the tube
after sterilization is complete. Drain the tube
completely of sterilizing water or solution. Fill the
tube with product prior to starting.
•
Make sure that condensate is drained completely in
BWS cylinders. The steam trap must be large enough
to carry away all condensate.
Summary of Contents for Waukesha Cherry-Burrell Votator II
Page 64: ...Parts Lists Waukesha Cherry Burrell Page 64 95 03057 October 2005 Single Mechanical Seal...
Page 66: ...Parts Lists Waukesha Cherry Burrell Page 66 95 03057 October 2005 Double Mechanical Seal...
Page 75: ...Waukesha Cherry Burrell Addendum October 2005 95 03057 Page75 Vertical Refrigeration System...
Page 76: ...Addendum Waukesha Cherry Burrell Page 76 95 03057 October 2005 Horizontal Frame Options...
Page 78: ...Addendum Waukesha Cherry Burrell Page 78 95 03057 October 2005 Vertical Hydraulic Schematic...
Page 83: ......