Waukesha Cherry-Burrell
Maintenance
11/2012
95-03057
Page 55
12. Lower head and tube assembly and service as required.
13. Lubricate and install new O-rings on both ends of tube.
14. Install new packing ring (on steam or liquid tubes).
15. To reinstall tube, reverse the procedure.
16. Torque bolts to 240 in-lbs (20 ft-lbs).
NOTE:
Take care to orient the tube flange holes to line up with
the holes in the jacket.
Figure 52 - Lower Tube and Service