
INSTALLATION AND MAINTENANCE INSTRUCTIONS
PARTS LIST - Trampoline
Parts Supplied
Ref
Description
Illustration
Qty
A
Top Rail Tube (A)
4
B
Top Rail Tube (B)
2
C
Top Rail Tube (C)
2
D
Leg Tubes (Left)
3
E
Leg Tubes (Right)
3
F
W-Shaped Tubes
3
G
T-Joint with Welded Socket
2
H
Mat with Sewn-in V-Rings
1
I
Frame Pad
2
J
Springs
48