1. PRE-ORDER CHECKLIST
All Green Systems need to be linked together via cables. A cable from one of the end Boost Converters in each
Pod needs to be connected to a dedicated Inverter. The Inverter needs to be wired to your electrical panel by a
licensed electrician. This system only works with 220 volt AC grid power. Below is an illustration of Cardio Units, Boost
Converters, Inverter, and grid power connections in a simple Pod configuration.
Example Standard Layout:
Standard Cable Lengths:
-Inverter to first Boost Converter (one 5m or
16’5” cable comes attached to Inverter)
-Individual Boost Converter cables (one 1.2m
or 47” cable comes with each Boost Converter)
Optional (Special Order)
-8m or 26’ 3” Inverter to Boost Converter cable (part #
100391021)
-5m or 16’ 5” Boost Converter cable (part # 145091090)
-Longer Boost Converter cables can be custom fabricated;
allow 2 weeks from time of order
-Y-Connectors are available for non-sequential Pod
configurations
*Note: Maximum total Boost Converter cable length for each Pod from the Inverter is 34m or 111’ 7” including a .3m
or 12” allowance for the internal length of each Booster Box in the Pod. See item 4 on page 5.