1. PRE-ORDER CHECKLIST (CONTINUED)

Legend:

I= Inverter

B= Boost Converter

C= Cardio Unit

Y= Y-Connector

Parallel:

Tree:

C

Y

I

B

C

B

C

B

C

B

C

B

B

C

C

Y

I

B

C

B

C

B

B

C

C

B

Y

C

B

B

C

1. Select the number and type of Cardio Units desired.

2. Determine the number of Pods desired: 1 Inverter is required per Pod. Up to 10 Cardio Units can 

be connected in a single Pod.

Series:

I

B

C

B

C

B

C

3. Construct a site plan by laying out desired equipment locations and assigned footprints on a scale 

drawing.  Include all Inverters, Cardio Units, and Boost Converter, plus Y-Connectors if needed.  There 

is a space planner application on our website that can be used to do this at: http://www.sportsartamerica.

com/SAF/space_planner.asp or you can ask your SportsArt Rep to provide site planning assistance.

4. Determine the Boost Converter cable lengths required. See page 4 for available lengths. Add up 

all Boost Converter cable lengths plus 12” for each Boost Converter in the Pod and compare the 

total with the maximum allowed length of 34m (111’ 7”).

5. Determine the number of raceways needed to cover exposed Boost Converter cables.  Each 

raceway is 1m or 39” long.* 

*Note: Included in the standard order are four raceways for the Inverter and one for each Cardio Unit. 

It is recommended that all of the exposed cables should be covered with the raceways to minimize trip 

hazards. 

Additional raceways and one custom length cable will be provided at no extra charge if specified at the 

time of original order. All Y-Connectors, cables and raceways ordered after the original order will be 

charged.

Cardio Units can be arranged in many topologies within a pod. These are some of the configurations possible:

Pre-Order Checklist

Pre-Order Checklist

Summary of Contents for Green System

Page 1: ...Green System Customer Planning Guide REV 1 5 21 2013...

Page 2: ...2 WARNING A LICENSED ELECTRICIAN IS REQUIRED TO INSTALL THIS PRODUCT IT IS HIGHLY RECOMMENDED THAT THE INVERTER BE AVAILABLE FOR THE ELECTRICIAN PRIOR TO SYSTEM INSTALLATION...

Page 3: ...and Operation 23 7 Post Installation Certifications 24 CongratulationsforincludingSportsArt space settingGreenSysteminyourfacility This cutting edge technology puts your facility in the forefront of...

Page 4: ...hs Inverter to first Boost Converter one 5m or 16 5 cable comes attached to Inverter Individual Boost Converter cables one 1 2m or47 cablecomeswitheachBoostConverter Optional Special Order 8m or 26 3...

Page 5: ...provide site planning assistance 4 Determine the Boost Converter cable lengths required See page 4 for available lengths Add up all Boost Converter cable lengths plus 12 for each Boost Converter in t...

Page 6: ...l Connections 2 Prepare for installing Inverter Mounting Bracket s Pgs 8 12 by coordinating best location with electrician and reviewing with installers It is recommended that the Inverter be mounted...

Page 7: ...s_manuals asp Procedure 4 Install the Boost Converters pg 16 Procedure 5 Link Boost Converters pg 17 Procedure 6 Connect Inverter to an End Boost Converter pg 18 Procedure 7 Conduct Post Installation...

Page 8: ...A4 InverterDCpowercord Inverter to BoostConverter 1 Components in the Hardware Kit No Name Qty Specification Notes 21 Mushroom top Phillips screw 4 3 16 L1 22 Plastic anchor for screws 4 5 16 1 1 4 2...

Page 9: ...height 1 1 2 lower than the top mounting bracket screws Mount at a height that will make the display easy to read b Insert one screw anchor 22 into each of the four holes Secure screws 21 in the upper...

Page 10: ...NUED d Slide the mount bracket to the left or right until it is level Then fully secure upper screws 21 into place Insert and secure lower screws 21 into place Finally remove screws 41 from the mount...

Page 11: ...er mounting bracket as follows First place the left wing of the Inverter bypass onto the mounting bracket Then place the right wing of the Inverter bypass onto the mounting bracket Use screws 23 to se...

Page 12: ...12 Hang the Inverter A1 onto the mount bracket A3 and use screws 41 to secure it into place 3 INSTALLATION PROCEDURES OVERVIEW CONTINUED Installation Procedures Overview...

Page 13: ...landing protection Operation temperature range 5 35 C Storage temperature range 5 35 C Enclosure Type 1 indoor use only Inverter Electronic Specifications DC Maximum input voltage 480V DC Operating vo...

Page 14: ...ground wire and secure the G label to it as shown in Figure 3 Before inserting the copper wire into the terminal roll the wire to consolidate the strands and prevent them from splitting Connect to th...

Page 15: ...on Power Products Do not replace it with any other type of connector 2 The DC cords comply with UL AWM 2586 specifications AWG16 105 C 221 F 600V three wire with colors red black and green with yellow...

Page 16: ...a A and B on the Cardio Unit in order 1 2 Note In area A place the open line with no wire on top In area B directly insert the plug into the connector on the Cardio Unit 3 Align the holes in the Boost...

Page 17: ...nector covers on the sides of the Boost Converter A12 Insert the between unit power cord A13 into the connector on the Boost Converter Then use screws to secure the connection Only connect up to ten p...

Page 18: ...tches on the Boost Converter and the cardio unit to the off position Remove the protective cover on the side of the selected end Boost Converter Connect the DC power cord A4 from the Inverter to the s...

Page 19: ...ectrical panel circuit breaker and Inverter power switch are turned off If not turn off power in those areas to prevent electrical shock during the inspection ITEM 2 Inspect the Inverter Boost Convert...

Page 20: ...rotate the plastic coupling nut clockwise until it hits bottom and makes a click sound Make sure both the black and white cable connectors latch properly Note G872 and G572 G862 power plug installati...

Page 21: ...erter bypass mode Load resistor mode Load resistor mode is used in the event of an Inverter malfunction This mode requires the use of the Inverter bypass box ITEM 6 Make sure that the Cardio Unit Boos...

Page 22: ...s are detailed in the Inverter Installation Manual The Startup Screen will display for approximately 10 seconds then the initial Operation Screen will be displayed Hold the Reset Button for 1 sec to s...

Page 23: ...tems attached to one Inverter At the startup banner screen simultaneously press and hold the following keys for two seconds WORKOUT LEVEL WORKOUT LEVEL CHANGE DISPLAY PASSWORD 0000 will appear on scre...

Page 24: ...an signoffs 1 Boost Converter to Cardio Unit cable connectors fully seated 2 Boost Converter interconnect cables connected and secured 3 Inverter connected to endmost Boost Converter 4 All Cardio Unit...

Reviews: