Installing U1 OTA Modules on the Landslide E10
Connecting the Antennas
Spirent Landslide Test System Installation Guide
|
43
3
Grip the antenna body and rotate the pivot to the upright position.
4
Flip the antennas up to a 90 degree position.
RF exposure warning:
This equipment complies with FCC radiation exposure limits set forth for an uncontrolled
environment. The equipment must not be co-located or operating in conjunction with any
other antenna or transmitter.
For the U1 LTE OTA Module:
Contains Transmitter Module FCC ID: N7NMC7455
Pivot must be in
the upright
position
Follow these steps to
install the second
antenna on each
module.
Summary of Contents for Landslide C100
Page 1: ...P N 71 008573 REV A Installation Guide Spirent Landslide Test System October 2018 ...
Page 12: ...12 Spirent Landslide Test System Installation Guide ...
Page 16: ...16 Spirent Landslide Test System Installation Guide ...
Page 44: ......
Page 48: ...48 Spirent Landslide Test System Installation Guide ...