3.696.5275.210
15
Generated Clean Steam Outlet
The next step in the installation process is to connect the generated steam system pipework
to the clean steam outlet port. The exact location of this port for the specific unit, as well as
outlet pipe diameter or flange size, can be determined from drawings supplied with the unit
(Fig. 5). A manual shutoff valve should be installed downstream on the generated clean
steam line for isolation purposes in case the unit must be disconnected from the system.
The shutoff valve should be in the closed position and remain so until the installation is
complete.
∆
Note: Refer to local regulations and specifications for site specific shutoff
and check valve requirements.
Note: All pipework connections for clean steam and water should be flanged or
sanitary design, type of gasket material should be suitable for clean steam application.
Cold feed water
Clean steam outlet
Fig. 4
Fig. 5
Summary of Contents for CSM-C
Page 6: ...3 696 5275 210 2...