6.4 Clamp Mechanism Maintenance and Replacement

 

 
All Shatterboxes have clamp levers that are anchored to the capsule retainer by yokes.  In 
current Shatterbox models (8500, 8515, 8530), the yokes are attached with Allen bolts inserted 
from the top, so they can be tightened easily if the yokes become loose.  Instructions are given 
here for tightening and replacing yoke bolts, and for replacing clamp arms and levers.   
 
If one of these bolts breaks and cannot be removed from the capsule retainer, or you are 
repairing an earlier model Shatterbox with the yoke bolts inserted from beneath, call our 
Service Department for advice and parts availability.  Contact information is in Section 12.0. 
 
The Shatterbox clamp mechanism is anchored to the capsule retainer by yokes: the long yoke 
(Diagram A, Item 19) holds the clamp arm (Diagram A, Item 14), and the short yoke (Diagram A, 
Item 12) holds the clamp lever assembly (Diagram A, Item 13).  Each yoke is attached to the 
capsule retainer by two Allen bolts (Diagram A, Item 10).  If a yoke loosens, the bolts must be 
tightened.  To do this, remove the C-clip (Diagram A, Item 18) from one end of the pin (Diagram 
A, Item 17) that holds the clamp arm or lever, and push the pin out from that end.  Use a 5/32-
inch Allen wrench to tighten the loose bolts; you may wish to remove the bolts, clean them, 
and apply a locking agent before tightening them. 
 
Clamp arms and clamp levers are replaced in a similar way, by pushing the pin out of the yoke, 
removing the old arm or lever, replacing it, re-inserting the pin, and holding the pin in place 
with a C-clip.  
 

6.5 Tightening or Replacing the Yokes

 

 
All but a few of the early Shatterboxes have a long yoke (Diagram A, item 19) and swing short 
yoke  (Diagram  A,  item  12)  that  are  fastened  to  the  capsule  retainers  by  Allen  bolts  inserted 
from above.  If these bolts loosen, they can be tightened with an Allen wrench after removing 
the pin holding the clamp arm or lever. To do this, remove one of the C-clips (Diagram A, item 
18) holding the pin (Diagram A, item 17) in place, and push the pin out from that end.  In the 
unlikely event that the bolts shear and cannot be removed from above, or if you have one of 
those early Shatterboxes with the bolts inserted from below, it will be necessary to remove the 
funnel  to  gain  access  to  the  underside  of  the  capsule  retainer.    After  detaching  the  upper 
section of the mechanism (Diagram A, item 18 from item 22), invert it and remove the eccentric 
arm (Diagram B, item 35) by first taking out the small setscrew from the large slotted setscrew 
(Diagram  B,  item  27)  and  removing  it.    Then  pull  the  funnel  straight  off  the  shaft.    When 
installing either yoke, first clean the yoke and its mounting bolts to remove all traces of oil, and 
treat each bolt with a locking agent to prevent loosening after assembly.  When replacing the 
funnel  and  eccentric  arm  make  sure  that  the  long  side  of  the  eccentric  arm  and  the  funnel 
counterweight (Diagram A, item 9) are on the same side of the funnel, otherwise the gyrating 
motion of the Shatterbox will be unbalanced. 
 

Summary of Contents for ENCLOSED SHATTERBOX 8530

Page 1: ...erty St Metuchen NJ 08840 732 623 0465 www spexsampleprep com 8530 ENCLOSED SHATTERBOX OPERATING MANUAL For 8530 115 and 8530 230 Shatterbox with Serial Numbers 07000 and higher this manual is Part No...

Page 2: ...5 1 Grinding Containers 13 6 0 Maintenance 17 6 1 Shatterbox Part Numbers 17 6 2 Cleaning the Shatterbox 17 6 3 Replacing Drive Belts 17 6 4 Clamp Mechanism Maintenance and Replacement 18 6 5 Tighten...

Page 3: ...ntainers are available in hardened steel tungsten carbide alumina ceramic and zirconia ceramic The full range of Shatterbox grinding containers is described in detail in the SPEX Handbook of Sample Pr...

Page 4: ...7 7 two prong plug supplied NOTE Operator is responsible for supplying alternate line cord plug if required Fuses 115V 60Hz version 10 amp slow blow fuse in inlet module 230V 50Hz version 5 amp slow...

Page 5: ...ace Check the power switch which is on the back of the cabinet next to the electrical inlet Diagram C Item 48 this switch should be in the off position the 0 should be pushed in when the power cord is...

Page 6: ...arms properly separated tighten the setscrews use a 1 8 Allen wrench As re installing the access panel note the electrical inlet on off switch and the fuse holder on the left side of the access panel...

Page 7: ...S CLAMP A CONTAINER IN PLACE WHEN RUNNING THE SHATTERBOX 2 DO NOT OVERTIGHTEN THE CLAMP 3 DO NOT OPEN THE LID UNTIL THE LID LATCH IS DISENGAGED 4 ALWAYS UNPLUG THE MILL BEFORE OPENING THE CABINET ACCE...

Page 8: ...ertightening the clamp can damage it Such damage is not covered by the warranty The different parts of the clamp are illustrated in Diagram A To use the clamp first swing the clamp arm to the left sid...

Page 9: ...will light up The timer can now be programmed Pressing this switch to the off position 0 will switch off power to the mill 4 5 2 Digital Timer The timer includes a minutes seconds numerical display p...

Page 10: ...ts 2 55 2 50 2 45 etc Every time power is turned off and back on the timer will revert to the 3 00 default setting To keep another timer setting leave the power on If power is not interrupted the time...

Page 11: ...stay latched After 5 seconds the original timer setting will re appear and the lid latch will release To have the mill pause during a run and retain the timer setting push the pause button The motor...

Page 12: ...lement s from the container Clamp the container into the capsule retainer Make sure that the friction disc is properly placed and the grinding container is firmly seated If the clamp is properly adjus...

Page 13: ...f and tungsten carbide for the small amounts of Ti Ta and Nb present Performance is also important the denser the grinding container material the more rapid the grinding Tungsten carbide is the denses...

Page 14: ...a Large 8521 Large Hardened Steel grinding container with puck and ring Typical sample capacity 60 100 grams sample volume range 30 120 ml The sample volume ranges given above are estimates not absolu...

Page 15: ...amp causing damage to both the mill and container 5 1 4 Emptying and Cleaning the Grinding Container The grinding container is usually emptied by brushing out the ground sample Typically a technician...

Page 16: ...ner it will get Particle size can almost always be lowered further by reducing the sample size or lengthening the grinding time or both Dry grinding is relatively efficient for most brittle materials...

Page 17: ...hly Diagram A Item 13 Clean off any excess dust or dirt from the outer segments of the clamp with special attention being placed on the hinge sections and on the roller It may be necessary to oil the...

Page 18: ...p levers are replaced in a similar way by pushing the pin out of the yoke removing the old arm or lever replacing it re inserting the pin and holding the pin in place with a C clip 6 5 Tightening or R...

Page 19: ...the door on the fuse compartment by gently prying it open at the top and flipping it down Use a small screwdriver to gently pry the red fuse holder out of the compartment as shown in Figure 3 Remove t...

Page 20: ...uter Dimensions dia x height 17 5 x 8cm Weight 12 5kg Recommended Load 20 60ml Complete with Dish Lid Ring Puck Gasket 8505 Alumina Ceramic Grinding Container Outer Dimensions dia x height 15 2 x 8cm...

Page 21: ...lete with Dish Lid Puck Gasket 8507R Rack Holds one or three 8507 or 8508 grinding containers Rack base assembly and lid included rack with three grinding containers lifts easily in and out of Shatter...

Page 22: ...of 28 SPEX SamplePrep LLC January 2010 This page contains restricted content To download the full unabridged version of this manual please visit our website at www spexsampleprep com or call Customer...

Page 23: ...of 28 SPEX SamplePrep LLC January 2010 This page contains restricted content To download the full unabridged version of this manual please visit our website at www spexsampleprep com or call Customer...

Page 24: ...of 28 SPEX SamplePrep LLC January 2010 This page contains restricted content To download the full unabridged version of this manual please visit our website at www spexsampleprep com or call Customer...

Page 25: ...of 28 SPEX SamplePrep LLC January 2010 This page contains restricted content To download the full unabridged version of this manual please visit our website at www spexsampleprep com or call Customer...

Page 26: ...of 28 SPEX SamplePrep LLC January 2010 This page contains restricted content To download the full unabridged version of this manual please visit our website at www spexsampleprep com or call Customer...

Page 27: ...of 28 SPEX SamplePrep LLC January 2010 This page contains restricted content To download the full unabridged version of this manual please visit our website at www spexsampleprep com or call Customer...

Page 28: ...site www spexsampleprep com E mail sampleprep spexcsp com In Europe please contact our European Headquarters at SPEX CertiPrep Ltd 2 Dalston Gardens Stanmore Middlesex HA7 1BQ United Kingdom Tel 44 0...

Reviews: