
10
2.3 Components and scope of supply BM 500 litres
The components and the scope of supply are shown in the following figure.
Lifting device
Crane
Lid
Hold-down bar
Screen plates (2 pieces)
Valve
Heating coil
Pump
Rollers steerable
and lockable
Temperature, time and
pump power
Malt pipe
Malt pipe seal
Brewing vessel
Tie rod /
filling level indicator
Electrical power unit incl.
connection
Tilting device
Summary of Contents for 41000-20
Page 2: ......
Page 6: ...Item no 46500 20 Braumeister 500 litres...
Page 18: ...Determination of the desired water level The screen for filling water...
Page 20: ......
Page 21: ...21 20...
Page 44: ...Mashing process Pour in malt measurements refer to a 20 litres Braumeister...
Page 67: ...67 66...
Page 73: ...73 72...
Page 79: ...79 78...