27
26
Gener
al inf
ormation
Technic
al data
Pr
epar
ation
Contr
ol
unit
Br
ewing
Notes
Maintenance
Appendix
Saf
ety
3.2 Special safety instructions
The temperature of the container, lid, and add-on parts can become ex-
tremely high. Towards the end of the brewing process, the boiler contains
boiling beer wort. Observe the installation instructions. Never attempt to
move the Braumeister while it is hot. Always use pot holders or gloves
when working on and with the Braumeister.
Risk of burning!
When lifting the lid, ensure that the condensation on the underside of the
lid flows back into the container. For this, hold the lid over the container
at an angle.
Risk of scalding!
The Braumeister always operate via a residual current circuit breaker
with a tripping current of max. 100 mA type B (AC-DC sensitive). A techni-
cal defect carries the inherent
risk of electrical shock!
When performing cleaning activities on the Braumeister always ensure
that the plug is disconnected (disconnection from mains). . The terminals
may still be live after the equipment has been shut down. Wait at least
3 minutes. Do not spray the device down or allow spray to come into
contact with electric components.
Danger of electric shock!
Important: It is imperative that you lock the plug connections at the
rear of the device (pump and heater) during the operation of the device.
Operating the device without securing plug and socket devices can lead
to overheating.
Fire hazard!
Please use the thermal sleeve available as an accessory for insulation.
When using your own insulation ensure that the electronics and the lo-
wer part of the Braumeister are sufficiently ventilated, as a heat build-up
and damage to the control may otherwise occur.
The pump must be vented prior to each use to prevent dry running. Ven-
ting takes place routinely in automatic operation. In the manual opera-
tion, the pump must be switched on and off several times until no more
air bubbles escape.
In order to prevent any danger that may be caused by outdated compo-
nents, compliance with the maintenance and inspection instructions is
mandatory.
Summary of Contents for 41000-20
Page 2: ......
Page 6: ...Item no 46500 20 Braumeister 500 litres...
Page 18: ...Determination of the desired water level The screen for filling water...
Page 20: ......
Page 21: ...21 20...
Page 44: ...Mashing process Pour in malt measurements refer to a 20 litres Braumeister...
Page 67: ...67 66...
Page 73: ...73 72...
Page 79: ...79 78...