SpectraLink Corporation
Maintenance and Diagnostics
Link WTS – Link 3000 MCU
Part Number: 72-0059-04-E.doc
Page 4
UL Information
This symbol on the nameplate means the product is listed by Underwriter’s
Laboratories, Inc. It is designed and manufactured to meet rigid U.L. safety
standards against X-radiation, fire, casualty, and electrical hazards.
The following are statements required for UL certification, related to safety procedures
that must be adhered to during installation.
Follow these general precautions while installing telephone equipment:
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically designed
for wet locations.
Never touch uninsulated telephone wires or terminals unless the telephone line has
been disconnected at the network interface.
Use caution when installing or modifying telephone lines.
When installing Base Stations outside or in buildings other than the one containing the
System Controller, take the following precaution:
If wiring for a Base Station exits a building—whether to reach an outdoor Base Station
location or to reach a Base Station in another building—the wiring must be protected at
both ends by a Quick Clip Fuse from Illinois Tool Works, Linx Division, model number
SCP-2X2. The Quick Clip Fuse replaces the bridging clips on the 66 blocks for all four
connections to the non-internal Base Station.