SpectraLink
Link 150 Installation and Operation
12/28/98
15
5.
Install SpectraLink System
5.1 Survey Site
Check the site to be sure pre-installation work has been completed correctly. This
includes:
1.
Location chosen for the MCU is adequate, and power is available. Multiple MCUs
must be installed side by side, not stacked on one another.
2.
Wiring to Base Station locations has been pulled and correctly terminated.
3.
Phone lines for the wireless telephones are installed and properly terminated.
4.
Dedicated line is available for remote access to diagnostic modem.
5.
Telephone system administrator is on-site to program the existing telephone
system.
If the work has not been completed, you can leave the site and reschedule the installation
when the items have been completed or corrected, or assist in preparing the site.
5.2 Check Components
The following items should be at the installation site.
LINES
CELLS
REGISTER
REGISTER
STEP
ADMIN
ADMIN
NORM
NORM
OFF
OFF
ON
ON
ALARM
ALARM
ERROR
ERROR
DELETE
1
2
3
4
5
6
7
8
9 10
11 12
13 14
15 16
1
2
3
4
Link 150 Master Control Unit – Depending on the size of
your system, there may be up to four MCUs, which will be
chained together to extend the coverage area.
AC Adapter – Supplies power to the Link 150.
Use only the provided Class II AC Adapter
with output 24VDC, 1A.
IPC Cable – Each MCU is shipped with one Inter-
Processor Communication (IPC) cable to carry signals
between Link 150 units. This 8-pin modular connector is
keyed so that it will not plug into the Base Station ports. It
is used only when multiple MCUs are chained together.
Summary of Contents for Link 150
Page 16: ...SpectraLink Link 150 Installation and Operation 12 28 98 8 ...
Page 22: ...SpectraLink Link 150 Installation and Operation 12 28 98 14 ...
Page 32: ...SpectraLink Link 150 Installation and Operation 12 28 98 24 ...
Page 34: ...SpectraLink Link 150 Installation and Operation 12 28 98 26 ...
Page 41: ...SpectraLink Link 150 Installation and Operation 12 28 98 33 Appendices ...
Page 42: ...SpectraLink Link 150 Installation and Operation 12 28 98 34 ...
Page 46: ...SpectraLink Link 150 Installation and Operation 12 28 98 38 ...
Page 72: ...SpectraLink Link 150 Installation and Operation 12 28 98 64 ...
Page 85: ...SpectraLink Link 150 Installation and Operation 12 28 98 77 ...
Page 87: ...SpectraLink Link 150 Installation and Operation 12 28 98 79 ...