![Spectra MKS Cirrus LM99 User Manual Download Page 74](http://html1.mh-extra.com/html/spectra/mks-cirrus-lm99/mks-cirrus-lm99_user-manual_1343287074.webp)
Cirrus SP101013.111 – 10 October 2012
MKS Instruments UK Ltd., Spectra Products
74
Before you begin
Ensure that the correct voltage and fuse ratings have been selected on the UDV Controller - see
Operating Manual Page 16.
All connection made to sample points.
The UDV should be fully closed – DO NOT OVERTIGHTEN.
The Cirrus should be powered up and pumping, the RGA’s filaments should be OFF.
Zero all front panel controls on the UDV Controller.
Connections
Connect the 3-core Baratron Output cable and the UDV signal cable to the sockets on the rear of the
UDV Controller as shown below.
UDV Signal Cable
Baratron Output Cable
Move the Set Point switch to the INTERNAL position.
Connect a voltmeter to the RED and BLACK cores of the Baratron Output Cable.