Chapter 2 - Installation Checklists
Use these checklists to ensure the BlackPearl NAS solution is prepared for installation and to
record important information during installation.
Preparing for Installation
Status
Description
r
The system components have acclimated to the site’s temperature for at least 24 hours in
its packaging (see
Acclimating the Spectra BlackPearl NAS Solution on page 18
).
r
The rack is prepared for installation (see
).
r
The system components are unpacked (see
Unpacking the Spectra BlackPearl NAS
).
r
The component inventory is complete (see
Inventorying the Components on page 26
).
Installing the Spectra BlackPearl NAS Solution
Status
Description
r
The components are installed on a sturdy work surface, or in a rack (see
Spectra BlackPearl NAS Solution in a Rack on page 35
).
r
The interface cables are connected (see
Connecting the Interface Cables on page 54
).
r
The power cables are connected and the system is powered on (see
Spectra BlackPearl NAS Solution
).
r
The front bezel is installed (see
Installing the Front Bezel on page 57
).