background image

Plumbing Installation

8

For optimal performance, use 4” plumbing when the total distance between the pump and jet housing is 30 ft or less. 
The plumbing should be as direct and free from turns or bends as possible because elbows and other fittings can 

create large friction losses and reduce the performance of the system. The shortest length of pipe with the 

minimum number of fittings possible should be used to avoid any significant friction loss due to the pipe and 

fittings. NOTE: Refer to Figure 2 for the BaduStream head loss curve.

A maximum of seven (7) 90

o

 elbows may be used with 30 ft of horizontal 4” pipe for the suction line and 30 ft of 

horizontal pipe for the discharge line without negatively affecting the performance of the system. 
NOTE: This applies to each individual pump used on the system. Refer to Figure 4 for the maximum TDH allowed to 
achieve recommended flow rates.

If more elbows are required for the installation, 4” sweeps must be used in place of the elbows. When using sweeps 
instead of elbows, a maximum of nine (9) 4” sweeps may be used with 30 ft of horizontal 4” pipe for the suction line 
and 30 ft of horizontal 4” pipe for the discharge line without negatively affecting the performance of the system. NOTE: 
This applies to each individual pump used on the system. Refer to Figure 4 for the maximum TDH allowed to achieve 
recommended flow rates.

If the pump(s) cannot be located within 30 ft of the jet housing(s) using the maximum number of 4” elbows or sweeps 
stated above, then 6” plumbing must be used. For the suction line, use 6” plumbing and fittings from the connection 
at the jet housing (or at the manifolds for two and three jet systems) to a point directly beneath the pump. From that 
point, install a 6” elbow. Then run 4” pipe vertically up to the suction connection of the pump and finish with a 4” elbow. 
For the discharge line, 6” plumbing should be installed from the discharge connection of the pump all the way to the 
pressure connection of the jet housing (or manifolds for two and three jet systems).

For two and three jet systems, the jet housings must be installed as close to 10” center to center as possible for 
maximum performance. DO NOT install the jet housing more than 12” apart on center. 
(See Figure 1 & 1A)

n

n

n

n

n

CAUTION: The discharge connection is at the center of the back of the jet housing. The suction connection is at the bottom 
of the jet housing.

CAUTION: The suction line should remain below water level from the suction connection at the jet housing to a point directly 
beneath the pump.

CAUTION: The center of the BaduStream jet nozzle(s) must be located 12” BELOW the water line for maximum performance 
and efficiency. The air regulator(s) should be located 3-4” ABOVE the water line.

CAUTION:  In areas with soft soil conditions or with frequent earth movement, a flexible section of 4” hose should be 
installed at the back of the jet housing to prevent plumbing or jet housing damage.

CAUTION: For trouble-free pump priming (up to 4 feet above the water line), first install a 6” long riser in the discharge 
connection on top of the pump(s). Then install an elbow and lead the discharge line(s) downward to the discharge connection(s) 
at the BaduStream jet housing(s) (Not required with 3.5 HP pump Model 72). On systems with 3 jet housings and 2 pumps, 
check valves MUST be installed at the discharge connections at each pump. 

CAUTION: Allow at least 12 hours curing and bonding time. Insufficient curing and bonding times can result in leaks and 
flooding.

CAUTION: Throughout the entire installation, make sure the plumbing connected to the BaduStream jet housing is well 
supported. Unsupported plumbing WILL crack the jet housing.

CAUTION: DO NOT use the pump as a fixed point (support) for the plumbing.

CAUTION:  When using 6” pipe, install 6” x 4” reducer bushings as close to the jet housing(s) as possible. For systems with 2 
or 3 jet housings, install the 6” x 4” reducer bushings as close to the 4” manifold tees  as possible. The 6” suction line should 
be run from the jet housing(s) and remain under the water line to a point directly beneath the pump. Install a 6” elbow at 
that point. Then run 4” pipe vertically up to the suction connection of the pump and finish with a 4” elbow.

Summary of Contents for Badu Stream II

Page 1: ......

Page 2: ...0 am to 5 00 pm EST Toll Free 800 223 8538 Phone 904 739 2626 Fax 904 737 5261 Website www usa speck pumps com Email technical usa speck pumps com Manufactured by Speck Pumps Jacksonville Florida USA...

Page 3: ......

Page 4: ...exceed the maximum flow rate stated on this product 7 The anti entrapment cover must be in place when using this product DO NOT use this product if the cover is missing broken or loose 8 The anti entr...

Page 5: ......

Page 6: ......

Page 7: ...for damage Open each carton and check the pump s jet housing s and control box for concealed damage such as cracks dents or a bent base If damage is found contact the shipper or distributor where the...

Page 8: ...s for two and three jet systems For two and three jet systems the jet housings must be installed as close to 10 center to center as possible for maximum performance DO NOT install the jet housing more...

Page 9: ...on and pressure lines as short and straight as possible If the pump is positioned further away then the pipe dimensioning has to be adapted so that almost loss free flowing is ensured BaduStream II He...

Page 10: ...g and 2 to 3 inches of plumbing stub out may be encased in gunite or concrete NOTE The BaduSteam assembly package contains all necessary parts for the installation of the unit into concrete gunite lin...

Page 11: ......

Page 12: ......

Page 13: ...Part 20 Air Regulator Gasket 60 x 11 x 2 mm Part 21 14 x 1 Screw Part 27 n n n n n n Make sure that the air regulator hose nipple part 14 is at the top and center of each jet housing Failure to do so...

Page 14: ...are installed using the eight 8 clamping ring screws part 9 2 9 3 or 9 4 The air regulator can be located in the tile above the water level or in the deck When tiling the pool adjust the air regulator...

Page 15: ...1 5 Nm or hand tight DO NOT use electrical or air drills NOTE The square cover part 8 will have an uneven appearance if the housing is not installed properly 4 For the air regulator assembly one 1 2 h...

Page 16: ...included with the touch button If a longer distance to the control box is required a junction box can be installed above the water line to splice additional cable as required NOTE The System ON OFF L...

Page 17: ...4 BLK 5 BLK 4 ORG 0 YEL 0 ORG 0 YEL 0 BLK 2 RED 2 RED 5 BLK 6 BLK 3 RED 3 BLK 0 BLK 1 BLK 0 RED 1 WHT 1 40A Shunt Tr p w AUX Switch C rcuit Breaker GFCI Module BLK 7 BLK 1 RED 6 BLK 6 BLK 5 BLK 3 RED...

Page 18: ...0 BLK 2 RED 2 RED 7 RED 7 RED 6 BLK 8 BLK 8 BLK 7 BLK 3 BLK 5 RED 3 RED 5 BLK 0 BLK 1 BLK 0 RED 1 WHT 1 50A Shunt Trip w AUX Switch Circuit Breaker GFCI Module BLK 3 BLK 6 BLK 5 BLK 7 RED 3 RED 5 RED...

Page 19: ...ill flash with an interval of 100ms Port 4 is on a schedule based on Time of Day Steady 5 with flashing dot The dot will flash with an interval of 100ms Port 5 is on a schedule based on Time of Day Fl...

Page 20: ...e tool breaks the surface of the water Then bring the two nozzles tools together to meet See Figure 16 Nozzle Adjustment Tools NOTE Though the nozzle adjustment tools are designed for outdoor use it i...

Page 21: ...is VGB 2008 compliant Do the covers come in different colors Yes The round covers can be ordered in gray or black The square cover is only available in black or white Does the air regulator come in di...

Page 22: ...Bad bearings Check for noise when shaft is turned by hand Motor will be very hot in bearing area when running Replace bearing 5 Motor runs hot These motors will run hot to the touch however this is n...

Page 23: ...Disassemble unit and correct 8 My ON OFF touch button is not working properly a Control Box b Wiring Check GFCI If green LED does not stay ON contact a certified electrician to diagnose control box c...

Page 24: ...7 11 1 11 2 10 4 13 1 2 12 12 3 8 9 1 27 15 16 14 5 Nozzle Adjustment Tool 31 9 2 9 3 9 4 18 16 14 17 21 18 20 19 26 23 24 25 22 24 6 Product Specification...

Page 25: ...REW CLAMPING RING PHILLIPS PAN M6 x 25mm SCREW CLAMPING RING PHILLIPS PAN M6 x 40mm SCREW SQ COVER EXT RING SLOT PAN M6 x 45mm SEAT NOZZLE SPACER NOZZLE 6 2mm SPACER NOZZLE 4mm GASKET CLAMPING RING GA...

Page 26: ...tem s 2 To the fullest extent permitted by law the Limited Warranty will be void and of no force or effect and Speck Pumps Pool Products Inc will have no liability responsibilities or obligations to B...

Page 27: ...SSIBILITY OR LIKELIHOOD OF SUCH DAMAGES OCCURRING WHETHER SUCH LIABILITY IS BASED ON CONTRACT TORT NEGLIGENCE STRICT LIABILITY PRODUCTS LIABILITY OR OTHERWISE AND EVEN IF ANY REMEDY STATED HEREIN FAIL...

Page 28: ......

Reviews: