BrewBlast™ 70CPH O&M                                                              

 

 

         

    South-Tek Systems 

        

 

3.3

 

SYSTEM OPERATIONS 

The  system  has  two  standard  run  modes 

– Run and Standby. When the power  switch is turned on, the indicator 

lights on the left side electrical panel will illuminate depending on what stage the generator is in; if the green light is 
illuminated the generator is in run mode, if the amber light is illuminated the generator is in standby waiting until the 
storage tank drops to the cut-in pressure. 

 

“Run” mode is when the BrewBlast™ 70CPH is producing nitrogen and feeding it into the storage tank.  The system 
will automatically enter “Standby” mode when the tank is fully pressurized (60-85 psig). It will remain in “Standby” 
mode until the tank pressure falls 7-10 psig. 

 

4

 

PRODUCT INSTALLATION 

4.1

 

UNPACKING AND PREPARATION (

BREWBLAST™ 70CPH) 

The 

BrewBlast™ 70CPH is packaged in a  cardboard  box,  should  be  carefully  opened,  and   all  parts  should  be 

inspected  for  damage  upon  receipt.  Identify  and  verify  that  all  parts  listed  on  the  packing  list  are  present  and 
undamaged.  STS  is  not  responsible  for  damages  that  have  occurred  during  the  shipping  and  handling  of  the 
BrewBlast™  70CPH.  Any  visual  damages  should  be  immediately  documented  and  reported  to  the  shipping 
company  responsible.  After the shipping company has been notified,  contact  STS  at (888) 526-6284 to assess 
the damages. 

Until Installation: 

 

Store the 

BrewBlast™ 70CPH in a dry and climate controlled (60-80°F) room. 

 

Always keep the 

BrewBlast™ 70CPH in an upright position, or in box as shipped. 

 

Do    not    connect    the    AC    power    cable    until    this    manual    has    been    read    completely    and    all 
connections are made as stated within. 

 

Keep all gas lines dry so that moisture does not enter the generator upon hookup. 

 

Never place or stack objects on top of the 

BrewBlast™ 70CPH. 

 

4.2

 

ELECTRICAL REQUIREMENTS 

The 

BrewBlast™ 70CPH requires 120 or 240V / 50-60 hz / 1ph connection. It has a built in 20A circuit breaker and 

a standard 3-prong US power cord is provided for the electrical connection. The system is UL 508A ICP approved. 
Electrical schematic available upon request. If you are located outside the US and need to select a power cord you 
will need one with an IEC 60320 C-19 connector and a properly rated plug for your region with a ground. 

4.3

 

MOUNTING (

BREWBLAST™ 70CPH 

The 

BrewBlast™ 70CPH can  be  mounted  to a  wall or placed on a floor.  It is recommended  that the BrewBlast™ 

70CPH be mounted to a weight-bearing wall that can support its weight as specified in Specifications (

BrewBlast™ 

70CPH).  If  mounted  on  t h e   floor,  it  should  be  fastened  in  place  so  that  it  cannot  move or fall over  due  to 
vibration.  The 

BrewBlast™ 70CPHshould  always  be  installed  indoors  in  an environment between  40°  and  85° F 

in  the  upright  position  where  it  will  not  be  damaged  by  water  or moving equipment. 

Leave at least 6” on the left 

side  of  the  cabinet  for  ventilation. 

36”  of  space  is  recommended  for  access  to  the  control  panel,  tube/pipe 

connections, and the front cover. There is a ¼” OD tube drain port on the bottom right of the cabinet. This can be 
plumbed to the nearest site drain. 

 

There is an optional mounting bracket kit (STS Part #: A05-TYP1-WH), that allows  you to  mount the system on  a 
standard 16

” wall  stud  width. Otherwise,  use  the  mounting  holes  on  the  cabinet  for  mounting  the  BrewBlast™ 

70CPH

 

securely and level, directly to the wall. 

 

 

Summary of Contents for 70CPH

Page 1: ...The Leader in Nitrogen Generation Technology 70CPH Operation and Installation Manual Version 0 05 30 2019 2020...

Page 2: ...BrewBlast 70CPH O M South Tek Systems 2 VERSION HISTORY Revision Implemented By Revision Date Approved By Approval Date Reason 0 M Thomas 05 30 19 A Norman 05 30 19 Initial Release...

Page 3: ...t 70CPH 8 4 2 Electrical Requirements 8 4 3 Mounting BrewBlast 70CPH 8 4 4 Installation BrewBlast 70CPH 10 4 5 Nitrogen Cylinder Back Up BrewBlast 70CPH 14 4 6 Start Up Procedures BrewBlast 70CPH 14 4...

Page 4: ...BrewBlast 70CPH O M South Tek Systems 4 Notes...

Page 5: ...ce the unit ensure the power switch has been turned to the off position then disconnect the unit s external power cord from the building electrical power supply if possible When servicing your system...

Page 6: ...rforming any electrical work NOTE Always following local and site safety regulations in conjunction with this manual Warning This manual must be read in its entirety prior to installing and operating...

Page 7: ...e system in a Standby Mode when the tank is full of Nitrogen McDantimTM Dual Output Gas Blender optional Precisely blends N2 with CO2 from the restaurant bar s in house storage cylinder tank The avail...

Page 8: ...been read completely and all connections are made as stated within Keep all gas lines dry so that moisture does not enter the generator upon hookup Never place or stack objects on top of the BrewBlas...

Page 9: ...inet in comparison to the wall a Use the supplied nuts and bolts to attach the upper 12 bracket onto the top flange per the diagram b Use the supplied carriage bolts and nuts to attach the 18 lower br...

Page 10: ...gas to all of the beverage lines Use only quality beverage tubing and fittings for all connections Keep in mind the temperature and pressure requirements when selecting them Always install a valve on...

Page 11: ...It is the responsibility of the installer to plumb these drains to an area where standing water is trapped or a drain is located Failure to do so can cause a slipping hazard on the floor below the ge...

Page 12: ...BrewBlast 70CPH O M South Tek Systems 12...

Page 13: ...BrewBlast 70CPH O M South Tek Systems 13 Optional Separate N2 Storage Tank Setup...

Page 14: ...em is turned on the backup will fill the N2 Storage tank and flow to the BrewBlast 70CPH keeping the internal blender pressurized with Nitrogen See below for visual piping connections 4 6 START UP PRO...

Page 15: ...ally The pressure switch is preset at the factory no field adjustment is required 4 7 CHECKING FOR LEAKS When a leak is suspected first try to listen for leaks around the connection ports If a leak is...

Page 16: ...mperature and line temperatures are maintained otherwise you will not be able to effectively push coffee from the keg Please consult with your local distributor for questions not answered in this manu...

Page 17: ...ilter bowls until the filter is completely depressurized 1 Disconnect the clear blue drain tubes from the bottom of the bowls 2 To remove the bowl turn the metal casing around the blue plastic filter...

Page 18: ...the filter bracket to keep track of when the filter was replaced last 10 Put the front cover back on the cabinet and the unit can be powered up again Once powered up you should hear the air compressor...

Page 19: ...BrewBlast 70CPH O M South Tek Systems 19...

Page 20: ...have the blender option check the CO2 regulator pressure gauge It should read between 80 and 100 psig If it is lower check the CO2 Storage tank to see if it needs refilling or if the pressure regulato...

Page 21: ...s received with defects that are not due to shipping a written claim should be submitted to South Tek Systems within 1 week of receiving the shipment South Tek Systems can deny all other claims at the...

Page 22: ...BrewBlast 70CPH O M South Tek Systems 22 Last Page...