PREPARATION
-10-
For Machines Mfd. Since 10/20
South Bend Tools
Model SB1093
P R E P A R A T I O N
Preparation Overview Required for Setup
The items listed below are required to
successfully set up and prepare this machine for
operation.
For Lifting
• Additional person to help lift machine.
For Power Connection
• A power source that meets the minimum
circuit requirements for this machine. (Refer
to the
Power Supply Requirements
section for details.)
For Assembly
• Safety Glasses for Each Person
• Level
• Phillips Screwdriver #2
• Combination Wrench 10mm, 17mm
• Hex Wrench 8mm
• 4" x 4" x 12" Wood Block
• Dust Hose 4" (length as needed)
• Hose Clamp 4"
• Dust Collection System
The purpose of the preparation section is to help
you prepare your machine for operation. The list
below outlines the basic process. Specific steps
for each of these points will be covered in detail
later in this section.
The typical preparation process is as follows:
1.
Unpack the machine and inventory the
contents of the box/crate.
2.
Clean the machine and its components.
3.
Identify an acceptable location for the
machine and move it to that location.
4.
Level the machine with included leveling
feet.
5.
Assemble the loose components and make
any necessary adjustments or inspections to
ensure the machine is ready for operation.
6.
Connect the machine to the power source.
7.
Test run the machine to make sure it
functions properly and is ready for operation.
Serious injury could occur if you connect
machine to power before completing setup
process. DO NOT connect to power until
instructed later in this manual.