SECTION 5 PREPARATION
5.1 TOOLS LIST
1.
The following tools are required to install the track system on a tractor:
•
Metric tools box
•
Impact wrench
•
Impact sockets: 13, 21, 24, 30 and 36 mm.
•
Wrench: 13, 21, 24, 30 and 36 mm.
•
Fork lift and/or crane
•
Torque wrench
•
Bottle jack (18 in. of stroke)
•
Jack stands (65 to 80 in.)
•
M20 X 2.5 Tap
5.2 PREPARATION
•
Make sure you have all the required parts and tools to do the job. The parts should be clean and free of corrosion.
•
Familiarize yourself with components and their location.
•
The systems installation sequence is front/rear or rear/front,
NOT
left/right, right/left or diagonally.
INSTALLATION, OPERATION AND MAINTENANCE GUIDE
15
Summary of Contents for S-TECH 7016
Page 8: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 4...
Page 15: ...INSTALLATION OPERATION AND MAINTENANCE GUIDE 11...
Page 16: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 12...
Page 18: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 14...
Page 56: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 52...
Page 66: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 62...
Page 70: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 66...
Page 74: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 70...
Page 78: ...Page Intentionally Left Blank INSTALLATION OPERATION AND MAINTENANCE GUIDE 74...
Page 83: ...INSTALLATION OPERATION AND MAINTENANCE GUIDE 79...