2-10 (E)
ZRD-1/ZRD-2/ZRCT-100/ZRCT-200
2. Insert the X positioning tool into the X positioning hole. Be sure to fully insert the X positioning tool
into the base hole.
.
Insert the X positioning tool into one of the two joint comas (BTM).
.
If you have difficulty in inserting the X positioning tool into the X positioning hole, slightly move the
display unit from side to side or back and forth to find the position into which the tool can be inserted.
t
The X positioning tool is supplied with the unit alignment tool.
3. Inert the two shafts in the direction of the arrow A, then lock them with the hexagon wrench in the
direction of the arrow B.
.
Fully rotate the hexagon wrench in the direction of the arrow B as far as it will go.
.
Be sure to lock them. Otherwise, the display unit will be tilted or displaced.
X positioning tool
Joint comas (BTM)
X positioning hole
Shaft
Hexagon wrench
A
B
Summary of Contents for ZRCT-100
Page 6: ......
Page 34: ......
Page 37: ...2 3 E ZRD 1 ZRD 2 ZRCT 100 ZRCT 200 Check operation ...
Page 88: ......
Page 156: ......