3-10 (E)
DWT-B30
3-2-8. RM-215 Board
Workflow: Battery case assembly (Section 3-2-1)
→
Antenna (Section 3-2-2)
→
Case (lower) (Section
3-2-3)
→
TX-172 board (Section 3-2-4)
→
DPR-396 board/Organic EL display element
(Section 3-2-5)
→
CN-4148/4078 board (Section 3-2-7)
→
RM-215 board
2
Spacer (P)
4
Flexible flat cable
Flexible flat cable
3
RM-215 board
1
Screw
(PSW1.7
)
3.5)
C2001
Insulated side
Valley fold
Valley fold
Insulated side
C2002
5
Coaxial cable
Summary of Contents for DWT-B30
Page 4: ......
Page 32: ......
Page 48: ......
Page 95: ...i DWT B30 Revision History Date History Contents 2019 12 1st Edition 9 932 731 01 ...
Page 96: ......