
4-111
DVW-790WS/709WS/707 P2V1
DVW-790WSP/709WSP/707P P2V1
4-2. Parts Replacement
Installation
5. FE Head Installation
Insert two bosses of the FE head into the longitudi-
nal hole of the entrance head assembly, and tighten
the one screw.
The standard tightening torque value :
9
x
10
_
2
N
.
m {0.9 kgf
.
cm}
6. Entrance Head Assembly Installation
(1) Attach the entrance head assembly with the
mechanism deck using the two screws.
The standard tightening torque value :
9
x
10
_
2
N
.
m {0.9 kgf
.
cm}
(2) Attach the connector.
DVW-707:
10001 through 10055
DVW-707P:
40001 through 40190
DVW-709WS: 10001 through 10125
DVW-709WSP: 40001 through 40255
DVW-790WS: 10001 through 10160
DVW-790WSP: 40001 through 40510
Boss
Boss
Longitudinal hole
M 2
x
5
DVW-707:
10056 and higher
DVW-707P:
40191 and higher
DVW-709WS: 10126 and higher
DVW-709WSP: 40256 and higher
DVW-790WS: 10161 and higher
DVW-790WSP: 40511 and higher
Adjustment After Replacement
7. Tape Running Adjustment
(Refer to section 5-1.)
Boss
Boss
Longitudinal hole
M 2
x
5