2-8
DCR-TRV240/TRV340
2-8. CONTROL SWITCH BLOCK (SS-1380)
2-9. CABINET (L) SECTION, CS FRAME ASSEMBLY (25)
VC-276
Board
8
Four dowels
3
Crow
9
Cabinet (L)
section
5
External (hot shoe) connector,
Shoe frame
6
Two screws
(M1.7
×
2.5), p
2
Screw
(M1.7
×
2.5), p
7
Screw
(M1.7
×
2.5), p
1
Screw
(M1.7
×
2.5), p
5
Cabinet (L)
assembly
1
MI screw
(M2
×
4) (H)
3
Two MI screws
(M2
×
4) (H)
2
Two MI screws
(M2
×
4) (H)
4
Grip
belt (ES)
REMOVING THE CS FRAME ASSEMBLY (25)
6
CS frame
assembly (25)
A
A
4
FP-264 flexible
board (15P)
PRECAUTION DURING
CABINET (L) SECTION INSTALLATION
OK
NG
B
6
8
Remove the control switch block
(SS-1380) in the direction
of the arrow
B
.
3
Screw (M1.7
×
2.5), p
4
Two dowels
7
Two dowels
1
Tape (A)
5
Tapping screw
(M1.7
×
5)
VC-276
Board
2
Control switch block
(SS-1380) (12P)
Push the eject knob in
the direction of the arrow
A
,
and open the cassette lid.
A
Routing of the flexible board of the Operation
Control switch block (SS-1380) when
attaching the Control switch block (SS-1380).