
5
Installation
5.4.3 Drilling the holes
Holes must be drilled into the wall to mount the storage system. The arrangement
of the holes depends on whether the big or the small extension cabinet is used.
A drilling template is part of the packaging of the main cabinet. Therewith it is
easier to mark the position of the holes on the wall. Please note that the drilling
template does not consider the levelling mat or the optional pedestal!
With small extension cabinet (up to 10 kWh)
16
10
15
32
83
8,
5
25
6
65
6
72
3
91
6
13
16
524
69
0
22
6
33
62
6
B
A
C
52
6
For storage systems consisting of main
and small extension cabinet:
►
Note that the storage system must
be placed on the levelling mat or the
pedestal (C).
►
Drill the holes shown in red in figure
on the left.
A Main cabinet
B Small extension cabinet
C Levelling mat (height: 10 mm)
or pedestal (optional, height:
80 mm)
Figure 12: Drill template for storage
systems with small extension cabinet
(figure is not to scale – all specifications are
in millimetres)
With big extension cabinet (up to 16 kWh)
16
10
15
32
83
8,
5
40
2
11
42
12
09
14
02
18
02
524
11
76
B
A
C
22
6
33
62
6
A
52
6
For storage systems consisting of main
and big extension cabinet:
►
Note that the storage system must
be placed on the levelling mat or the
pedestal (C).
►
Drill the holes shown in red in figure
on the left.
A Main cabinet
B Big extension cabinet
C Levelling mat (height: 10 mm)
or pedestal (optional, height:
80 mm)
Figure 13: Drill template for storage
systems with big extension cabinet (figure
is not to scale – all specifications are in
millimetres)
24 / 68
KD-421 | Part no. 22136 | EN | X03