![Sonic SCS-60 Operation Manual Download Page 84](http://html1.mh-extra.com/html/sonic/scs-60/scs-60_operation-manual_1320638084.webp)
7-14
(3) Replacement of the zinc ring (work in lifting)
In order to prevent electrolytic corrosion, a zinc ring is attached to the upper part of the
dome. Replace the ring periodically.
Change electrolytic corrosion-preventing zinc plates annually.
The zinc ring has a two-part structure.
Remove two hexagon socket head cap screws to remove the zinc ring.
After replacement, tighten the zinc ring with fixing screws.
The order model number
Name
Order number
Qt
Zinc ring
59-00184
1
Zinc ring
Fixing screw
Hexagon
socket
head cap screw
Caution
・
Change electrolytic corrosion-preventing zinc plates annually.
Be sure to perform electrolytic corrosion prevention. If electrolytic corrosion
prevention is not performed, the transducer may fall accidentally or there
may be an influx of seawater into a dome, in the worst case.
!
Summary of Contents for SCS-60
Page 1: ...Model SCS 60 Scanning Sonar Operation Manual Ver 5 00E Rev 0...
Page 2: ...MEMO...
Page 12: ...x MEMO...
Page 16: ...1 4 MEMO...
Page 32: ...4 6 MEMO...
Page 50: ...5 18 MEMO...
Page 70: ...6 20 MEMO...
Page 86: ...7 16 MEMO...
Page 94: ...8 8 MEMO...